
Just recently I have been able to get back to work on the layout. The task at hand in to complete the second railroad line that will service the sawmill operation for finished lumber to be shipped to market. For the drying yard, finished lumber will be loaded into box cars and at this point there are five box cars from the C&S and eight belonging to the Porcupine Valley waiting to be loaded. They will have a long wait however, since the sawmill has not even been built yet and for that matter the forest the logs will come from has not be built yet either. Track is being laid at this time to tie these two areas together so a transport system will be in place when the other parts are completed.

No comments:
Post a Comment